Overview

The layout of facility is guided by a "Quality by Design" master plan. The location of various buildings, roads & Green zones are well defined.


The State-of-the-art facility stands on 1 acres of land and covers the following installations:

  • R & D
  • QC
  • QA & Regulatory Affairs
  • Manufacturing Blocks
  • Engineering
  • Warehouse
  • Materials & Finished Goods Stores
  • Utilities Building

 

Production Blocks

Covering an area of 10500 sq. ft in multi level buildings, manfacturing blocks are designed. Manufacturing blocks has quality by design air-handling units as per cGMP.
Separate intermediate plant covers an area of 2,000 sq. ft.

The facility has 7 reactors ranging from 600L to 2000L & 10 Glass Assembly ranging from 20 L to 200L and three independent clean room areas. The supply of utilities and utility headers are isolated from manufacturing area to avoid congestion and cross contamination inside the plant.

 

Engineering

Well organized GEP procedures, experienced technical team, facilities for engineering materials warehouse, fabrication and maintenance workshop, well designed centralized utilities and power backup generators.

 

Warehouse

The facility has three dedicated warehouse covers an area of 3,500 sq.ft. for handling of all incoming raw materials, packing materials and finished products with pre-defined storage conditions. Facilities for handling of gases, hazardous chemicals and solvents independently.